Pipelines and Gas Supply Acts' amendments consultation - August 2024
NSW DCCEEW consulted on proposed changes to the Pipelines Act 1967 and Gas Supply Act 1996. This consultation is now closed. Thank you to all who participated.
-
-
- Why we are upgrading our electricity system
- How we are transitioning our electricity system
- How NSW will benefit from the energy transition
-
- A long-term vision for locals
- The best office in the world
- The future of farming is here
- Renewables generates 100 new jobs for Western Sydney manufacturer
- The people behind NSW’s energy transition
- NSW ’s giant super battery is underway
- Unlocking opportunities for the people of Dubbo
- Meet Bridget from the Central-West Orana REZ
-
-
- Agreement between the state of NSW and Origin on its plans for Eraring power station
- NSW coal market price emergency
- Delivering a Gas Decarbonisation Roadmap
- NSW Embedded Network Action Plan
- NSW Transmission Planning Review 2025
- Network-to-network connection process
- Corrosion protection systems
- Demand response
- Electricity Market Operation Rules
-
- Review and reform
- Safeguard design
- Exemptions
-
-
-
- Air conditioner - eligibility
- Core eligibility
- Electric water heater replacement with a solar electric boosted water heater - eligibility
- Electric water heater replacement with an air source heat pump - eligibility
- Electric water heater replacement with an air source heat pump - eligibility
- Gas water heater replacement with a solar electric boosted water heater - eligibility
- Gas water heater replacement with an air source heat pump - eligibility
- Gas water heater replacement with an air source heat pump - eligibility
- HVAC - eligibility
- Heat pump water heater - eligibility
- Hot water heater - eligibility
- Install a new air source heat pump - eligibility
- Pool pump - eligibility
- Refrigerated cabinet - eligibility
- Solar battery - eligibility
- Solar battery - eligibility
- Solar battery eligibility landing
- Spare refrigerator or freezer - eligibility
- Ventilation or refrigeration motor - eligibility
-
- Air conditioner - certificates
- Electric water heater replacement with a solar electric boosted water heater - certificates
- Electric water heater replacement with an air source heat pump - certificates
- Electric water heater replacement with an air source heat pump - certificates
- Gas water heater replacement with a solar electric boosted water heater - certificates
- Gas water heater replacement with an air source heat pump - certificates
- Gas water heater replacement with an air source heat pump - certificates
- HVAC - certificates
- Heat pump water heater - certificates
- Hot water heater - certificates
- Install a new air source heat pump - certificates
- Pool pump - certificates
- Refrigerated cabinet - certificates
- Solar battery - certificates
- Solar battery certificates landing
- Spare refrigerator or freezer - certificates
- Ventilation or refrigeration motor - certificates
- Solar battery - certificates
-
-
- Administration and compliance
- Energy certificate schemes
- Gas network safety and operating plans
- Pipeline management plans
-
- Scaling up a thriving renewable fuel industry in NSW
- Going circular in clean energy
- Pipelines and Gas Supply Acts proposed updates - 2024
- Public consultation: Ministerial Statement of Expectations: Protecting NSW customers of embedded networks
- Solar emergency backstop
- ASP Scheme review
- Corrosion Protection Systems Regulation 2020
- Digital metering: improving service delivery in NSW
- Electricity Infrastructure Roadmap consultations
- Queensland-Hunter Gas Pipeline ATS
- Public lighting code
- Service and installation rules
Consultation period
From: 21 August 2024
To: 10 September 2024
The NSW Department of Climate Change, Energy, the Environment and Water sought feedback on proposed changes to the Pipelines Act 1967 and Gas Supply Act 1996.
The NSW Pipelines and Gas Supply laws regulate the safe and reliable supply and distribution of gas and the safe construction and operation of pipelines in NSW. The NSW Government has identified areas for improvement to enhance governance, safety, and operational efficiency of the regulatory regime established by Pipelines and Gas Supply Acts.
The consultation paper outlined proposed changes to the Pipelines and Gas Supply Acts, including the:
- improved governance of end-of-life gas supply and pipeline operations and infrastructure management.
- expansion of government inspector powers to investigate incidents.
- update of penalties to ensure they remain appropriately dissuasive, including accumulating penalties for ongoing non-compliance for certain offences.
- introduction of penalty infringement and show cause notices to align with comparable energy legislation.
- increases to local court penalty limits.
- additional refinements to streamline the NSW pipeline and gas supply regulatory framework, ensuring alignment with industry standards, clarity in responsibilities and enhanced operational effectiveness.
Industry briefing
An industry briefing on the Consultation Paper was held on Tuesday 3 September 2024. Presentation material is available in the Documents.
Next steps
The following are the key milestones for the finalisation of the legislation changes.
-
Consultation period
21 August - 10 September 2024
-
Bill to be considered by Parliament
Indicative timing: November 2024
-
Future proposed changes to the Pipelines and Gas Supply Regulations, and associated consultation
Indicative timing: 2025
More information
For more information, see Our role in networks or contact the project team at [email protected].