NSW ’s giant super battery is underway

-
-
- Why we are upgrading our electricity system
- How we are transitioning our electricity system
- How NSW will benefit from the energy transition
-
- A long-term vision for locals
- The best office in the world
- The future of farming is here
- Renewables generates 100 new jobs for Western Sydney manufacturer
- The people behind NSW’s energy transition
- NSW ’s giant super battery is underway
- Unlocking opportunities for the people of Dubbo
- Meet Bridget from the Central-West Orana REZ
-
-
- Agreement between the state of NSW and Origin on its plans for Eraring power station
- NSW coal market price emergency
- Delivering a Gas Decarbonisation Roadmap
- NSW Embedded Network Action Plan
- NSW Transmission Planning Review 2025
- Network-to-network connection process
- Corrosion protection systems
- Demand response
- Electricity Market Operation Rules
-
- Review and reform
- Safeguard design
- Exemptions
-
-
-
- Air conditioner - eligibility
- Core eligibility
- Electric water heater replacement with a solar electric boosted water heater - eligibility
- Electric water heater replacement with an air source heat pump - eligibility
- Electric water heater replacement with an air source heat pump - eligibility
- Gas water heater replacement with a solar electric boosted water heater - eligibility
- Gas water heater replacement with an air source heat pump - eligibility
- Gas water heater replacement with an air source heat pump - eligibility
- HVAC - eligibility
- Heat pump water heater - eligibility
- Hot water heater - eligibility
- Install a new air source heat pump - eligibility
- Pool pump - eligibility
- Refrigerated cabinet - eligibility
- Solar battery - certificates
- Solar battery - eligibility
- Solar battery - eligibility
- Solar battery eligibility landing
- Spare refrigerator or freezer - eligibility
- Ventilation or refrigeration motor - eligibility
-
- Air conditioner - certificates
- Electric water heater replacement with a solar electric boosted water heater - certificates
- Electric water heater replacement with an air source heat pump - certificates
- Electric water heater replacement with an air source heat pump - certificates
- Gas water heater replacement with a solar electric boosted water heater - certificates
- Gas water heater replacement with an air source heat pump - certificates
- Gas water heater replacement with an air source heat pump - certificates
- HVAC - certificates
- Heat pump water heater - certificates
- Hot water heater - certificates
- Install a new air source heat pump - certificates
- Pool pump - certificates
- Refrigerated cabinet - certificates
- Solar battery - certificates
- Solar battery certificates landing
- Spare refrigerator or freezer - certificates
- Ventilation or refrigeration motor - certificates
-
-
- Administration and compliance
- Energy certificate schemes
- Gas network safety and operating plans
- Pipeline management plans
-
- Scaling up a thriving renewable fuel industry in NSW
- Going circular in clean energy
- Pipelines and Gas Supply Acts proposed updates - 2024
- Public consultation: Ministerial Statement of Expectations: Protecting NSW customers of embedded networks
- Solar emergency backstop
- ASP Scheme review
- Corrosion Protection Systems Regulation 2020
- Digital metering: improving service delivery in NSW
- Electricity Infrastructure Roadmap consultations
- Queensland-Hunter Gas Pipeline ATS
- Public lighting code
- Service and installation rules
The Waratah Super Battery will be one of the largest battery energy storage systems in the world, and it is being built right here on the Central Coast of NSW.
The project will ensure a reliable supply of energy across the state, especially during times when it is needed the most, like in the event of power surges during a storm or bushfire.
Construction of the Waratah Super Battery is well underway, and on track for opening in 2025.
In this video, the Executive Director of Technical Services at EnergyCo, Andrew Kingsmill, and EnergyCo’s Chief Project Officer, Mark Westbrook, share updates on an important Waratah Super Battery milestone and what this means for the project and the energy transition.
Across NSW, our electricity network is transforming. With the Electricity Infrastructure Roadmap, the NSW Government is accelerating investment in renewable energy and storage infrastructure, like the Waratah Super Battery, to deliver the electricity network to power our state now and for the next generation.